Hallo Leute
Die konvektiven Überhitzer von meiner Simplex-Lok 'Elisabeth' waren nach 43 Jahren Lebensdauer am Ende, schließlich durchgebrandt und ausgerechnet in Karlsruhe.
Bevor ich nun fortfahre und die ganze Geschichte berichte, bringe in einen Ausschnitt aus einem Artikel von den britischen Modellbauer Dough Hewson. Freund Doug wird nichts gegen die Veröffentlichung hier haben, um aber nicht mit der Copyright-Vorschriften zu kollidieren zeige ich hier nur einen Ausschnitt aus einem Bericht den Dough gerade in ENGINEERING IN MINATURE, Oktober 2016 hat. Er baut hier wieder mal eine LNER/BR Y4 Lokomotive und derzeit ist er eben bei den
Überhitzern.
Zitat:
Superheaters Überhitzer
Before we make a start on the superheaters we will just have a word about them. I know very weil that if you belong to a club there will be peopie who tell you that
these are a waste of time. Having now had getting on for sixty years' experience I can tell you they are well worth every minute you spend on making them and on the
Y4 they will transform your engine. I built my first Y4 to Ron Bray's original drawings, well looseiy anyway, although I corrected a few of the detail and added more but that is another story. The one thing I did copy were the superheaters and they were plain copper tube with brass return bends as generaliy described by LBSC.
However, I do not think that LBSC ever envisaged the way we would use our engines. Once I had completed my Y4 I don't think that the boiler went coid for six months or more and all that time was spent shifting muck and bailast. In fact, one of our members calculated that the Y4 and the Gert we borrowed shifted the scale equivalent of 25,000 tons of soil and 15,000 tons of ballast as I insisted that everything went by rail. At that time we had not even haif finished the railway
but it was great fun. When anyone new arrived on the scene the first thing we did was to teach them to drive both engines. The engines were sometimes in steam
from 9am until well after dark (10pm). However, the copper elements only lasted for a year or so and burnt through so I made new ones but this time I copied them off a design I had seen in one of the magazines. These consisted of a tube in a tube. Absolutely useless, as one always got a shower on opening the regulator and we
were always back at the water column.
I made another set but this time I had just acquired some 5/32" stainless tube from good old Whistons when they were on the go. At the time I did not know what I was going to do with the tube but then someone asked if I had tried bending it. "No" was the answer and then he said "Well, you can bend it double without it kinking" so I thought they might be ideal for superheaters, even though a bit on the small side. The tube came in 1 m Iengths so i did as suggested and balanced a length on my finger to find the middle and then bent it over a former which I had made and hey presto, it bent double with only the slightest kink. This was easily put right
with a gentle squeeze in the vice. I pushed the tube through the flue until it hit the back of the firebox and measured what was sticking out and then transferred
that measurement to the bent end and bent the element back again so that the double bends would be over the fire. The tube was just long enough to meet the fitting at the front and I fixed those on with a couple "5/16" x 32 unions so that they couid be removed individually if there was ever a problem. That was in 2008 and they are still in there! We now supply these elements ready bent and I think mine have done about 800 hours now.
However, the main point of this story is that I took the locomotive to Gilling for its first run with the new superheaters and the first thing I noticed was that I
was not shoveiling half the coal I used to do and only needed to go to the water column every 45 minutes or so instead of every half hour, if I was lucky, and I only
have the water in the tanks. Since then I have improved my lubricator and that has added another ten minutes between water column visits. If I leave off shunting
for a few moments the superheater glows bright red, so do not let anyone tell you that superheaters are no good, they are essential for an efficient locomotive.
Hot Header
The hot header is just a 1/2" length of the same brass bar. Face the end, centre and drill down to about 3/16" deep with a 3/18" drill and then another 7/16" further with a 1/4" drill and part off just over half inch long. Turn this round and face the other side. Drill three no.30 holes in the face and then transfer these holes to the screwed in fitting and tap those 5BA. Make three stainless steel studs about 7/8" long with 1/4" of 5BA thread on each end and screw these into the front fitting.
You now need three 1/4" drillings as shown on the drawing but do not take too much notice of the 51° angle on the drawing as a few degrees either way will not matter. The drilling on the right hand side is for the snifting valve connection (anti vacuum valve). The three 5/16" x 32 unions required are made in a similar manner to the ones which you made for the steam brake cylinder. These three can now be siiver soldered into the header but also you need to silver solder a length of 3/8" copper tube into the 3/8" hole at the back at the same time. This needs to protrude 1/8". Once finished, just try the header into the hole in the steam pipe flange and take a small skim off if you need to. When you fit the superheaters you need an O-ring to go on the end to push into the regulator and another one the for the header.
The elements were made as described above and you can now use your bending jig to form some bends on the ends to meet up with the unions. Incidentally, the jig for
bending the elements was made from a short length of 5/8" brass bar with two grooves turned in it about 7/16" apart. This can then be used for the double bends for the second operation. The grooves need to be almost a push fit for the tube, well certainly a close fit, and the depth needs to be well over half the diameter of the tube, in fact nearly the full depth, and this helps to prevent the tube from kinking. The elements need cutting so that they just pop into the unions on the header and then you can make a couple of olives and silver solder them on. We will tidy up the other ends when we come to finish the pipework off in the smokebox.
1
2
3
4
Ende Zitat
Ich habe die neuen Überhitzer (Typ Radiant) auf eine ganz ähnliche Weise gebaut. Da Dough aber Elemente auch gleich vor gefertigt anbietet, habe ich diese fertig gebogen bei ihm gekauft. Schließlich singt er oben ja geradezu ein Loblied...
5
Diese Elemente reichen bis in die Feuerbüchse und ich habe nur 2 davon.
Dough hingegen baut manche Lok mit einer beinahe vorbildgerechten Anzahl. Dann wird die Lok zu einem F1 Modell.
6
Bei meiner Montage ging ich ganz ähnlich wie oben berichtet vor, dabi habe ich aber einen kleinen Fehler gemacht, der natürlich korrigiert wurde.
Davon berichte ich im 2. Teil.